Open Access

Table 1

Informations about (1) the two wind farms where audio recordings were carried out and (2) the corresponding recording campaigns.

Wind farm Smøla Skomakerfjellet
Description
 Commissioning year 2002 (2005) 2016
 Number of turbines 68 4
 Turbine manufacturer Bonus (Siemens) Vestas
 Turbine type B76/2000 (SWT-2.3–82) V112/3300
 Nominal electric power (MW) 2.0 (2.3) 3.3
 Hub height (m) 70 (70) 94
 Rotor diameter (m) 76 (82.4) 112
Recording campaigns
 Wind speed during the recordings (m/s) at 2 m height 4.0 4.2
 Recordings selected for the listening test

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.