Issue |
Acta Acust.
Volume 5, 2021
|
|
---|---|---|
Article Number | 27 | |
Number of page(s) | 10 | |
Section | Room Acoustics | |
DOI | https://doi.org/10.1051/aacus/2021022 | |
Published online | 13 July 2021 |
Technical & Applied Article
Uncertainties of ISO 3382-3 sound pressure level quantities
Institute for Occupational Safety and Health of the German Social Accident Insurance (IFA), 53757 Sankt Augustin, Germany
* Corresponding authors: moritz.schneider@dguv.de; jan.selzer@dguv.de
Received:
9
September
2020
Accepted:
30
May
2021
The ISO 3382-3 standard uses the measurable sound pressure based parameters D2,S and Lp,A,S,4 m to describe the acoustic properties of open-plan offices. As yet however, no treatment of the measurement uncertainty of these parameters according to the Guide to the expression of Uncertainty in Measurement (GUM) is to be found in the peer-reviewed literature. This technical note therefore describes how the measurement uncertainty can be declared according to GUM. The mathematical framework presented here can be used and expanded by other laboratories to derive their own uncertainty estimates. It is also applied in this document to 44 measurements yielding combined uncertainties for D2,S of 0.55 dB ≤ ≤ 0.67 dB and for Lp,A,S,4 m of 0.19 dB ≤ ≤ 0.83 dB. The implications of this result are discussed with regard to limit values in technical regulations.
Key words: Office / Uncertainty / Classification / ISO 3382-3 / GUM
© M. Schneider et al., Published by EDP Sciences, 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (https://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
1 Introduction
Work in open-plan offices is often associated with complaints of poor privacy and overall dissatisfaction with the acoustic situation (e.g. [1, 2]). Higher sick leave rates are also reported for open-plan offices and flex-offices than for cell-offices [3]. Furthermore, speech has been shown to impair performance (e.g. [4]). Surveys and questionnaires are appropriate means of identifying the load or stress upon the exposed office workers. However, the planning and design of technical measures to improve the acoustic situation in an open-plan office requires room acoustic descriptors. Since the reverberation time is not sufficient to describe the room acoustics of an open-plan office, ISO 3382-3 [5] defines a set of six further acoustic parameters, of which the spatial decay rate of speech D2,S and the A-weighted sound pressure level of speech at a distance of 4 m Lp,A,S,4 m are relevant for this elaboration.
Unfortunately, due to the new method at the time of publication, ISO 3382-3 contains no information on the uncertainty of measurement, even though it obviously exists [6–9]. This presents an obstacle to the assessment of technical protective measures where their effect is equal or lower in magnitude to the measurement uncertainty. The same is true where measurement results from different laboratories for which no measurement uncertainty is stated are compared. Thirdly, the measurement uncertainty is crucial in comparisons of measurement results with limit values and for the determination of limit values themselves.
The Guide to the expression of Uncertainty in Measurement (GUM) [10] provides a general, mathematical framework for describing the effect of different uncertainty components. However, to our knowledge no peer-reviewed publication currently exists presenting results for the measurement uncertainty of D2,S and Lp,A,S,4 m with reference to the GUM. Few uncertainty components for ISO 3382-3 measurements have been addressed in the literature, so far. Given the same office conditions, Yadav et al. [6] measured two different paths and a single path, with two different speaker positions in each case. From these two measurements, a “within measurement” standard deviation of 0.44 dB ≤ σw ≤ 0.61 dB for D2,S and of between 1.04 dB and 1.61 dB for Lp,A,S,4 m is derived. The same authors refer to Haapakangas et al. [7], who used a similar method to derive their uncertainty estimate of ±1 dB for D2,S and of ±1.5 dB for Lp,A,S,4 m. According to the GUM, these results represent an estimate of the uncertainty attributable to different measurement paths.
A further contribution in this regard is a round-robin test presented by Kelz [8]. Ten laboratories participated in this test, which yielded measurement results of 4.3 dB ≤ D2,S ≤ 6.1 dB and 47.9 dB ≤ Lp,A,S,4 m ≤ 51.1 dB. Since these ranges are the result of all contributions to the uncertainty, they are used in Section 2 to deduce a conservative estimate of the uncertainty caused by different choices of path.
Currently, the lack of a rigorous uncertainty declaration is abridged for example by the work of Lenne et al. [9]. Although these researchers apply the GUM in the same way as the present paper, they use it mainly to validate their Monte-Carlo simulations in accordance with Supplement 1 of the GUM [11]. They include the uncertainty caused by sound level meters and distance measurements. Since they used the Monte-Carlo simulations to extend the range of the uncertainty for the distance measurements up to 1 m, they were also able to some extent to cover the uncertainty caused by different paths. They stated expanded uncertainties of less than ±1 dB for D2,S.
Consideration of (expanded) uncertainties of the order of 1 dB reported in the available literature shows the ranges of current limit values to be in the same order of magnitude. For example, the German national guideline VDI 2569 [12] supports assignment of open-plan offices to different room acoustics classes from A to C. The classification is carried out using levels of sound propagation [12] for single measurement paths with a step size of 2 dB for the parameters D2,S and Lp,A,S,4 m. Furthermore, national standards and guidelines using the single number quantities of ISO 3382-3 are available, for example in France and Finland ([13] and presented in [14]). The French standard focuses on requirements for the D2,S and the attenuation Dn. The Finnish guideline considers the D2,S with a step size of 2 dB, Lp,A,S,4 m with a step size of 3 dB, and also the distraction distance rD, based on the Speech Transmission Index (STI), for acoustic classification. Acoustics classes from A to E are available. Draft international standard ISO/DIS 22955 will provide further requirements for different open office types based on the sound pressure level quantities of ISO 3382-3 [15] in the future.
Based on the above, the present work applies the framework of the GUM to D2,S and Lp,A,S,4 m. It covers the uncertainty components for the measurement equipment, distance measurement and choice of path. This is outlined in the next section together with the background information on the measurements to which we apply the GUM. The resulting equations are stated in Section 3 together with the expanded uncertainties for the measurements. The equations may assist other laboratories in deriving their own uncertainties, since they are easily expanded and do not require additional Monte-Carlo simulations as in [9]. Finally, the results are discussed in Section 4, particular attention being paid to the validity of the approach and possible improvements to it, and to the regulatory requirements mentioned above.
2 Methods – determining the uncertainty
2.1 GUM – law of uncertainty propagation
Based on all available information on a measurement, the GUM specifies a procedure for deriving the uncertainty, i.e. a range of values associated with the result of a measurement, that characterizes the dispersion of quantity Y [10]. In this case, Y is equal to the parameters D2,S and Lp,A,S,4 m of ISO 3382-3. All contributions to the uncertainty are input into this process in the form of variables Xi in a function f, the mathematical model Y = f(X1, X2, … , XM).
This model is subject to the law of uncertainty propagation, which comprises a first-order Taylor series expansion for f followed by the formation of expected values. This is dependent upon the Xi variables not leading to pronounced changes in Y, as the Taylor series expansion is otherwise not valid. These steps yield σY,c,corr, the combined standard uncertainty of Y:
The index “c” refers to combined, the index “corr” to the fact that the Xi variables are not required to be independent at this point. In addition, the partial derivatives of f with regard to Xi are the sensitivity coefficients cY (i):
The sensitivity coefficients weight the standard deviations σY(i) and the covariances σY(i, j) of the Xi variables. The index 〈〉 indicates that they are evaluated at the expected values. This means that all measurable quantities take the measured values and that the uncertainty components Xi are expressed by their expected values 〈Xi〉.
In addition, statistical independence of the Xi variables can be made a requirement. This enables their covariances to be neglected, and Equation (1) becomes,
In the present work, the combined standard deviation σY,c describes the dispersion of Y. Since the exact standard deviations in Equation (3) are never known, recourse must be made to estimations of the standard deviations , . These estimates are termed uncertainties in the GUM: , ,
Finally, the expanded uncertainty U = k·uc must be constructed, in which k ≈ 2 is typically selected as the coverage factor k, assuming a confidence level close to 95%.
This assumption is motivated by the fact that for many cases the central limit theorem leads to approximately normally distributed values for Y. For a normally distributed Y, k = 1.96 leads to a confidence level of 95% for 〈Y〉 ± U, where 〈Y〉 is the measured value of Y [16].
2.2 Mathematical model
The mathematical model Y = f(X1, X2, … , XM) is created as follows. Firstly, the dependency of D2,S and Lp,A,S,4 m upon the measurable quantities rn and Lp,Ls,n,i must be recognized, where rn is the distance of a measurement point to the loudspeaker in the measurement path and Lp,Ls,n,i is the sound pressure level of the loudspeaker measured at rn in the octave band i. The Lp,Ls,n,i quantities are combined into Lp,A,S,n, the A-weighted sound pressure level of speech at the distance rn:
Here, Ci is a sum of constants for the octave band i given by Equation (6). Ci comprises the constants Ai of the A-weighting and Lp,S,1 m,i, the sound pressure level of omnidirectional speech at a distance of 1 m, both in accordance with Table 1 of ISO 3382-3 [5], and Lp,Ls,1 m,i, the sound pressure level at a distance of 1 m from the acoustic centre of the loudspeaker in a free field, calculated on the basis of the sound power level of the loudspeaker:
The ISO 3382-3 standard assumes a constant decrease of Lp,A,S,n when the distance rn is doubled in the range 2 m ≤ rn ≤ 16 m.
This leads to the following regression model:
(7)where r0 = 1 m is the unit distance and ϵ is a normally distributed variable with a constant variance. Expected values for the intercept and the slope are formed in ISO 3382-3 by means of a regression analysis [17]. For this purpose, N pairs of the independent variable and the dependent variable Lp,A,S,n must be measured. Changing the logarithm base from 2 to 10 and use of the abbreviations , Ln = Lp,A,S,n yields the following definition of D2,S:
The definition of Lp,A,S,4 m is obtained by setting rn = 4 m and replacing β0,1 with their estimates in Equation (7). The estimate = −D2,S was introduced in the last equation. The estimate is obtained from the mean values of the dependent and the independent variables [17],
Equations (8) and (10) show how D2,S and Lp,A,S,4 m depend on the measurable quantities rn and Lp,Ls,n,i. To complete the mathematical model, the present work now introduces uncertainty components Xi for the measurement equipment, the distance measurement and the uncertainty due to different paths. Owing to the lack of further information, we assume an additive influence as follows:
In this definition, Xi are random variables with an expected value of zero: 〈Xi〉 = 0. They are added to the measured value of their respective measurable quantities, e.g. 〈rn〉 is the measured distance of rn at point n.
If Equation (2) is applied to D2,S and Lp,A,S,4 m as defined in the mathematical model in Equations (8)–(11), the result is the sensitivity coefficients for these parameters. They are presented in Section 3. Note that the additive models of Equation (11) are defined such that their first derivates with respect to Xi are always equal to 1, especially .
2.3 Estimation of the uncertainty
The previous subsection described how the sensitivity coefficients cY(i) can be determined. This subsection is concerned with determination of the uncertainties, i.e. the estimates of the standard deviations ui = . The present work uses the “Type B” approach of the GUM, in which the information on the uncertainty is not derived from repeated dedicated measurements.
Should an estimate for be found in the literature, the GUM permits its use directly in Equation (4) (Sect. 4.3.4 in [10]). At the same time, it may be assumed that Xi exhibits a normal distribution and, based on the principle of maximum entropy [18, 19], that Xi possesses a uniform distribution, if it modifies the measurand only within a fixed range ±b. The resulting estimate of the standard deviation is then . At this point, it must be stressed that the assumption with regard to the form of the distribution does not affect the law of uncertainty propagation. It is however important for a subsequent Monte-Carlo analysis [11].
With this information in mind, the following assumptions can be made:
Two standards exist containing information on the uncertainty of the measurement of octave bands. One of these is IEC 61672-1 [20], which is used in [9] and is reserved for laboratory measurements. Section C5 of ISO 9612 [21] is therefore used here. This standard, which deals with field measurements, declares an uncertainty of (Xequip,n,i) = (equip) = 0.7 dB for the measured sound pressure level Lp,Ls,n,i for a class 1 sound level meter. This estimate for the uncertainty of measurement equipment is the same for all octave bands i, all measurement points n, and also for the two quantities Y = {D2,S, Lp,A,S,4 m}. A normal distribution of Xequip,n,i is assumed in all cases.
The accuracy of distance can be measured correctly within a range of ±1 cm with a tape measure or laser distance meter. A uniform distribution with an uncertainty of (Xdist,n) = (dist) = 0.01 m/ can therefore be assumed for all measurement points n. This estimate is also used for the two quantities Y = {D2,S, Lp,A,S,4 m}. We assume a uniform distribution of Xdist,n.
The work of Haapakangas et al. [7] (Sect. 1) states a very large uncertainty with respect to the choice of different measurement paths when compared to the work of Kelz [8]. While the former reports a standard deviation of 1 dB for , the latter puts forward a range of 1.8 dB for D2,S. This range enables the standard deviation of (Xpath) = (path) = 0.9 dB/ ≈ 0.52 dB to be estimated in the same way as the uncertainty of the distance measurement. This estimate is used here, as it is closer to the estimate of Yadav et al. [6] and refers to ten observed paths rather than the two in [6]. It is a conservative estimate, since the range is based upon all contributions to the uncertainty, and measurement paths have been included that are not strictly consistent with the standard. A uniform distribution is assumed.
At this point, no further contributions to the uncertainty for Lp,A,S,4 m are assumed beyond those discussed above. They affect the combined uncertainty for Lp,A,S,4 m simply by application of the law of uncertainty propagation to the mathematical model (Eq. (10)).
Some parts of the random effect from the source (loudspeaker) are addressed in ISO 3741 [22]. In addition, observations during the measurements have shown that Lp,A,S,4 m may be affected by an offset that is constant during one measurement, but can change from one measurement to the other. This might be due to the calibration procedure of the source and should in principle be corrected. However, additional measurements to quantify these effects are beyond the scope of this work. Nevertheless, the impact of the findings in ISO 3741 for one example is discussed below in Section 3.4.2.
The question remains whether or not these contributions to the uncertainty are correlated. It may be safely assumed that the uncertainty of the distance measurement is independent of the other two contributions to the uncertainty. However, the sound pressure level is measured simultaneously in all octave bands at fixed points with a fixed source. For such measurements, the measurement between the octave bands may be correlated at a given measurement point [23]. Since this is caused by the properties of the sound field in the room, correlations between different measurement points are again neglected. Different choices of paths may once again lead to differences between the extent of these correlations. Nevertheless, being aware of these possible correlations, it has to be considered at this point that all contributions to the uncertainty are statistically independent, and Equation (4) is used for the combined uncertainty. In addition, for one measurement, the worst-case situation as described in ISO 12999-1 [24] is assumed, namely a complete positive or negative correlation of the octave-band measurements at each point n. In this case, the correlation coefficient is equal to ±1, and the covariance factorises to the two variances: σY(i, j) = ±σY(i)σY(j). Since the variances estimates are known, the (worst-case) combined uncertainty according to Equation (1) can be calculated in this case.
2.4 Monte-Carlo simulations
While the assumption of the form of the distribution does not affect the calculation of uc according to the law of uncertainty propagation, it is important for the numerical calculation of uc by means of Monte-Carlo simulations [11]. With the use of random number generators, the Monte-Carlo simulation calculates a histogram of possible values of Y. For each random variable Xi in the mathematical model, a number is randomly generated based under the assumed form of the distribution function and the assumed . These numbers enter the Equations (8), (10), (11), and one simulated value for Y is obtained.
The QMSysGUM [25] commercial software package was used in the present work for calculation of 220 × 103 values (trials) for D2,S and Lp,A,S,4 m. This default value for the Monte-Carlo trials was sufficient for numerical stability of the results to be attained. The normalized histogram of these values can be interpreted as a probability distribution density of Y. The 95% confidence interval is simply the (symmetrical) range around the measured value that covers 95% of the simulated values. For a normally distributed variable, the skew and the (excess) kurtosis of the histogram are both expected to be close to zero.
Since the Monte-Carlo simulations do not depend on the conditions which are set when formulating Equation (4) (such as Taylor series expansion, independence of Xi, etc.), Monte-Carlo simulations can be used to validate the results according to the law of uncertainty propagation.
2.5 Standard error of regression analysis
If Equation (7), which also yields an estimate of the uncertainty of D2,S and Lp,A,S,4 m, is correct, the uncertainty due to the distance measurement must be zero or at least much smaller than the variance of ϵ. In addition, this variance must be constant for all Lp,A,S,n. If these requirements are met, the sum of the squared residuals can be used to calculate , an estimate of the variance of ϵ,
This estimate comprises all contributions to the uncertainty affecting Lp,A,S,n in a given measurement. In this case, this is restricted to Xequip,n,i, as only one path is measured in a given measurement and a negligible distance uncertainty is a requirement.
An estimate can also be formulated for the standard error of , namely, [17]. This is an alternative estimate for the combined uncertainty of D2,S for one measurement, and since Lp,A,S,n has the same standard error as [17], its standard error can be used in the same way:
3 Results
3.1 Combined uncertainties
As outlined in the preceding section, Equation (2) was applied to the mathematical model Equations (8)–(11). This yields the sensitivity coefficients for D2,S. The cY(i) must be evaluated at the measured or expected values. Therefore, rn is replaced by the measured value 〈rn〉, for example, and 〈Xi〉 = 0 by definition. Equation (5) thus becomes,
(14)and for the independent variable in Equation (7) (adjusted to base 10),
These abbreviations can be used to express the sensitivity coefficients for D2,S. In the following equation, the index i describes the current octave band and n the current measurement point, while the general summation index is switched to j for the octave bands and to m for the measurement points. This leads to the sensitivity coefficient with respect to the uncertainty in distance measurement:
(16)and the sensitivity coefficient with regard to the uncertainty in measurement equipment is
The last two equations contain only measured values and constants, and by use of the estimates in Section 2.3 and the observation that , the combined uncertainty is obtained according to Equation (4) for the mathematical model of D2,S: . The following equation defines with regard to the three uncertainty components considered in the present work:
In the same way, the quantity Lp,A,S,4 m in Equation (10) can now be addressed and the respective sensitivity coefficients calculated, where 〈D2,S〉 defines the value of D2,S when all measured values are inserted, and is the average of 〈Rn〉 in Equation (15). The sensitivity coefficient with regard to the uncertainty of the distance measurement is thus,
(19)and the sensitivity coefficient with regard to the uncertainty of the measurement equipment is,
The last two equations depend on Equations (16) and (17) respectively. In addition, the sensitivity coefficient with regard to the uncertainty due to the choice of different paths is,
The combined uncertainty according to Equation (4) for our mathematical model of Lp,A,S,4 m is thus defined by the following equation with regard to the three uncertainty components considered in the present work:
The Equations (18) and (22) for the sensitivity coefficients are the first result of the present work, as they constitute the first step in calculation of the combined uncertainty for the measurements described in the following Section 3.2.
3.2 Measurements
This subsection presents the results of measurements according to ISO 3382-3 that have been conducted as part of noise abatement consultations. Between 2015 and 2019 a total of 17 offices have been examined and some of the results have been presented already in [26]. The number of workstations in the offices varies between 11 and 50 with a median of 30.
In each office or office zone, two to five measurement paths have been investigated. This gives rise to 44 different measurement paths, each with a different value for D2,S and Lp,A,S,4 m, that are shown in Figures 1 and 2. The results of the measurement paths vary within following ranges: 3.0 dB < D2,S < 8.8 dB, 43.5 dB < Lp,A,S,4 m < 54.9 dB (see Figs. 1 and 2).
Figure 1 Boxplot representation of all 44 measurement path results for D2,S. The individual measurement results are indicated as circles, the mean value is represented by x. |
Figure 2 Boxplot representation of all 44 measurement path results for Lp,A,S,4 m. The individual measurement results are indicated as circles, the mean value is represented by x. |
The ranges of D2,S and Lp,A,S,4 m are similar to those reported in the literature. For example Haapakangas et al. [7] report values from 21 open-plan offices: 3.3 dB < D2,S < 12.1 dB, 44.6 dB < Lp,A,S,4 m < 53.8 dB. Yadav et al. [6] report values from their reliability and repeatability measurements in 27 open-plan offices: 2.6 dB < D2,S < 8.4 dB, 46.2 dB < Lp,A,S,4 m < 56.0 dB.
3.3 Uncertainty estimates
Application of the Equations (18) and (22) to the data presented in the previous Section 3.2 yields a range of combined uncertainties: 0.55 dB ≤ ≤ 0.67 dB and 0.19 dB ≤ ≤ 0.83 dB, as seen in Figures 3 and 4.
Figure 3 Boxplot of for all 44 measurement paths. The results of the individual calculations are indicated as circles, the mean value is represented by x. Three possible outliers are visible. |
Figure 4 Boxplot of for all 44 measurement paths. The results for the individual calculations are indicated as circles, the mean value is represented by x. |
Based on the dataset of measurements, 11 measurement paths with more than four measurement points per path are available. These dataset is used to recalculate the parameters and D2,S with four, five and six consecutive measurement points. For example, when the results for N = 4 are computed, the last two measurement points are dropped if the measurement was conducted with six measurement points. For N = 5, the last point was then rejected, and so on. This analysis and the equations above indicate a dependency between the uncertainty and the selected number of measurement points. Increasing the number of measurement points along a measurement path decreases the overall combined uncertainty (see Fig. 5). Omitting measurement points during the measurement or the analysis of a measurement leads to different results in the D2,S. The number of measurement points determines the length of the measurement path. Calculating the aforementioned parameter for an increasing measurement path length can increase or decrease D2,S. Owing to differences in office furniture, a spread of −1.3 dB < ΔD2,S < 1.5 dB occurs in the measurement results across the same measurement paths with changing numbers of measurement points N.
Figure 5 Decrease in combined uncertainty with increasing number of measurement points N along the same measurement paths. Legend shows the number of the office followed by the number of the path. |
3.4 Detailed results of one example
In this subsection, detailed results from one measurement consisting of N = 6 measurement points are presented. The measured parameters are D2,S = 8.8 dB and Lp,A,S,4 m = 49.2 dB. The combined uncertainties of these parameters due to the law of uncertainty propagation are = 0.567 dB and = 0.552 dB. With a coverage factor of k = 2, this amounts for both parameters to an uncertainty range of ±U = ±1.1 dB, which can be attributed to the measurement result with a confidence of 95%.
3.4.1 Relevance of contributions to the uncertainty
Since all quantities in Equations (18) and (22) are positive, the relevance of the different contributions to the uncertainty can easily be expressed as the percentage that they add to the combined uncertainty. Firstly, it must be noted that the different contributions to the uncertainty have approximately the same percentages with regard to the combined uncertainties of D2,S and Lp,A,S,4 m. The percentages for are therefore discussed below and the respective numbers for Lp,A,S,4 m indicated in brackets.
The most important contribution stems from the uncertainty caused by the choice between different paths. This alone accounts for 85% (75%) of the combined uncertainty. Without this effect, the combined uncertainty for this measurement would be 0.226 dB (0.277 dB). This effect is followed by the uncertainty caused by the equipment in the sound pressure measurement for the octave band around 500 Hz. This accounts for 13% (20%) of the combined uncertainty, and the same effect for the octave band at 1000 Hz accounts for 3% (5%). A closer look at these two octave bands shows that the contributions for measurement points n = {1, 2, 5, 6} are more important for the combined uncertainty than those in the middle of the path n = {3, 4}. The sum of all other contributions (other octave bands, the distance measurement) amounts to less than 1% of the combined uncertainties.
3.4.2 Uncertainty of the sound source
This work assumes in Equation (6) that Lp,Ls,1 m,i, the sound pressure level at a distance of 1 m, is a constant, although it is a measurable quantity and thus affected by uncertainty. For example, the International Standard ISO 3741 [22] is mainly concerned with the uncertainty attributed to the determination of the sound power level of a given source in a reverberation room. In addition, it describes that the sound pressure of a source is affected by mounting and operating conditions during field measurements. The former effect is attributed to an uncertainty , the latter to . This leads to a combined uncertainty of . The influence of the instability of the sound power level of the source under investigation can be measured as the uncertainty due to repeatability in a round-robin test. It is mainly affected by the stability of the acoustic condition in the given room and is likely to outnumber [22]. The informative Annex G of ISO 3741 gives a guidance value of , assuming a high-precision measurement = 0.5 dB and stable operating conditions = 0.7 dB.
With this information, the mathematical model in Equation (6) can be adapted to,
(23)where Xsource is a normally distributed random number with expected value zero and variance = 0.9 dB. As a result, the combined uncertainty increases from 0.57 dB to 0.64 dB. It is clear that this effect is not negligible. However, since a better description of operating conditions of sound sources in open-plan offices requires additional measurements, it is beyond the scope of this work. The same holds true for a constant offset Δ for Lp,Ls,1 m,i, that can be corrected by subtracting Δ from Lp,Ls,1 m,i in Equation (23).
3.4.3 Possible correlations
As outlined in Section 2.3, a complete positive or negative correlation at the measurement points for the Xequip,n,i at a given measurement point n was assumed. This leads to the addition of the following term in the brackets of Equations (18) and (22),
(24)where the fact that the estimates for the standard deviations (equip) are identical in all octave bands has been used. As a result, the combined correlated uncertainty for D2,S is 0.521 dB ≤ ≤ 0.601 dB. For Lp,A,S,4 m this amounts to 0.505 dB ≤ ≤ 0.596 dB. For both parameters, the correlation effect would change the combined uncertainty by less than 10% were it to exist.
3.4.4 Monte-Carlo simulation
In the next step, a Monte-Carlo simulation was used to determine the uncertainty. To this end, simulated values of D2,S and Lp,A,S,4 m based on the mathematical model of Section 2 and the distributions assumed there. As a result, 95% of the simulated values were in a range of ±U = ±1.0 dB around the measured values of D2,S and Lp,A,S,4 m. The histograms of D2,S and Lp,A,S,4 m deviate from a normal distribution. The estimate for the skew is 0.002, that for the (excess) kurtosis −0.854. We thus observe a platykurtic distribution with large shoulders and smaller tails.
To investigate this deviation, the Monte-Carlo simulation was recalculated with three changes. Firstly, a normal distribution for was assumed. Secondly, was neglected. Finally, the estimated uncertainty for to was reduced. In all three cases, good agreement is achieved between the histograms and the results of Equation (4) with an assumed normal distribution (almost identical expanded uncertainty ranges, kurtosis close to zero).
3.4.5 Standard error of regression analysis
To confirm the requirement of constant variance of ϵ we have calculated the standard uncertainties of Lp,A,S,n according to the framework outlined in Section 2. We omit the details for the sake of brevity. The standard uncertainties of Lp,A,S,n cover a comparatively close range between 0.44 dB and 0.48 dB, and since the uncertainty due to the distance measurement is negligible, the requirements for calculation of the standard error of the regression coefficients according to Equations (13) are met. These amount to = 0.52 dB for D2,S and = 1.58 dB for Lp,A,S,4 m. These estimates must be compared with the estimates without path uncertainty, i.e. 0.226 dB and 0.277 dB. The higher values for the standard errors from the regression analysis are due to the fact that the residuals alone cause a variance of ≈ 1.05 dB.
4 Discussion
Based on the justifications for the approach given above, it has been a conscious choice to present the results using the law of uncertainty propagation (Eq. (4)). Lenne et al. [9] have already shown that recourse need not be made to Monte-Carlo simulations unless investigation of extreme cases is desired, such as distance measurements varying by more than 0.5 m. In addition, even this approach does not fully cover the uncertainty due to different paths, which is caused not by a (large) uncertainty in the distance measurement, but by completely different outlines of measurement paths in a given open-plan office. This uncertainty is more appropriately expressed by a separate term in the mathematical model, as in Equation (11).
However, the inclusion of this parameter has caused a deviation from the normal distribution in the Monte-Carlo simulation presented here. In principle, this deviation can be ignored, since the normality assumption leads only to a larger and therefore more conservative uncertainty range. On the other hand, the additional Monte-Carlo simulations show that if the available information on can be improved, good agreement with Equation (4) and normally distributed parameters Y is attained. Since only a range of D2,S values has been reported in [8], one has no choice but to assume a uniform distribution due to the principle of maximum entropy. If a larger sample and a better analysis (i.e. a instead of a range) were available, a normal distribution could be assumed. In addition, the reported range is known to be caused by all contributions to the uncertainty. The estimate for the path uncertainty is therefore too large. As shown, for a normally distributed or a smaller uncertainty estimate for the results of Equation (4) and the normality assumption for Y would coincide again with Monte-Carlo simulations. This deviation does not therefore impair the use of Equation (4).
On the contrary, the Monte-Carlo simulations show the best agreement with the analytical results of Equation (4) for the other contributions to the uncertainty. This supports several assumptions. Firstly, the assumed uncertainties are still sufficiently small to justify the first-order Taylor expansion. Secondly, the distribution assumptions for the influences Xi are justified. Finally, the choice of k = 2 ≈ 1.96 is justified, since the numerical distribution of Y = {D2,S, Lp,A,S,4 m} is very close to the normal distribution. There is therefore no need to resort to numerical simulations, since Equation (4) offers a reliable approach. Nor is this conjecture changed by possible correlation between octave band measurements: even were this effect to be present, it would not amount even in the worst case to more than 10% of the combined uncertainty in the analysed measurement.
For these reasons, the approach of Equation (4) has been considered the best means of expressing uncertainty for D2,S and Lp,A,S,4 m. The alternative approach of standard errors in Equation (13) is restricted to very limited cases and is based solely on information obtained from small samples (in our case N = 6). The latter is one reason for the deviation of the standard errors from the respective uncertainties determined in the present work. The other reason is that the present work has also neglected certain contributions to the uncertainty, such as repeatability and the sound pressure level of the loudspeaker. These are discussed below.
Conversely, Monte-Carlo simulations are needed only in extreme cases, if the requirements of Equation (4) are no longer met [9]. In addition, the approach of Equation (4) is flexible and permits a transparent discussion of the available information. The detailed presentation of the results for the sensitivity coefficients in the previous section should therefore encourage further laboratories to verify their own uncertainty calculations. In addition, the mathematical model presented here is easily adapted to cases in which more or other information is available:
Unfortunately, only a worst-case estimate for the largest contribution, namely the path uncertainty, is available. This problem could be addressed in a future round-robin test (see Sect. 3.4.3).
The ranges reported in the literature for Lp,A,S,4 m [6–8] and the estimate from the standard error in the present work indicate that we do not have access to a contribution to the uncertainty for this parameter. This additional uncertainty could be caused by an uncertainty due to a constant offset Δ of the sound pressure level of the source (loudspeaker) which affects the intercept (Lp,A,S,4 m) more than the decay rate (slope, D2,S). Such an offset together with a non-negligible uncertainty of Lp,Ls,1 m,i has to be addressed in future measurements (see Sect. 3.4.2).
A round-robin test could also address the question of possible correlations in the measurement of the sound pressure level in the octave bands.
It is obvious from the mathematical model that the uncertainty with respect to repeatability is not yet incorporated. However, a variable Xrep can easily be added in Equation (11) with an uncertainty estimate that might also be determined in a round-robin test (repeatability or precision in [27]). This could also help to explain the difference in the spread of Lp,A,S,4 m between the literature and the present work.
Besides the uncertainty due to repeatability, a round-robin test usually summarizes all other contributions to the uncertainty in a single uncertainty estimate, the trueness or reproducibility due to the differences between participating laboratories. However, a large part of this estimate is already covered here.
Based on these points, we expect a better description of the path uncertainty to yield a decrease in the combined uncertainty calculated in the present work. In addition, the results of Figure 5 indicate that the uncertainty decreases with an increasing number of measurement points. It therefore seems reasonable to use more than the minimum number of measurement points wherever this is possible. At the same time, an increase in the uncertainty due to missing terms as discussed above is expected. Overall, the order of magnitude of the expanded uncertainty of ±1 dB appears realistic, not least in the light of the cited literature. This raises the question how D2,S and Lp,A,S,4 m can be assessed if they are connected with this uncertainty range.
The knowledge gained by the present work indicates that a spread of 2 dB for one of the two parameters is too small for classification of the acoustic quality of an office, since with the expanded uncertainty U determined for both parameters, D2,S and Lp,A,S,4 m, a value range of 2 dB is already covered. This is too large to neglect. A classification scheme with a step size of 3 dB is more suitable, as presented for the Lp,A,S,4 m in [14]. Where requirements for open offices are defined based on the sound pressure level single number quantities of ISO 3382-3, the findings presented in the present work should also be taken into account.
5 Conclusion and outlook
With this work, a contribution to the calculation of expanded uncertainties for the measurement of sound pressure level parameters in accordance with ISO 3382-3 is presented which as yet has been missing in the peer-reviewed literature. The declaration of expanded uncertainties is necessary for the comparison of measurement results between laboratories, assessment of noise reduction measures and classification of offices by means of limit values.
The calculation rests upon the law of uncertainty propagation for uncorrelated influences and this choice has been justified. The equations presented here are intended to facilitate its use by other laboratories. A revision of limit values should reflect the published information on expanded uncertainties, which is expected to be of the order of ±1 dB.
Uncertainty calculations can never be exhaustive. The contribution made by this document will therefore, we hope, be improved by round-robin tests in the future.
Conflict of interest
Author declared no conflict of interests.
Acknowledgments
We sincerely thank Ingo Albrecht for his valuable support in performing the measurements.
References
- J. Kim, R. de Dear: Workspace satisfaction: The privacy-communication trade-off in open-plan offices. Journal of Environmental Psychology 36 (2013) 18–26. [CrossRef] [Google Scholar]
- C. Bodin Danielsson, L. Bodin: Difference in satisfaction among employees in different office types. Journal of Architectural and Planning Research 26, 3 (2009) 241–256. [Google Scholar]
- C. Bodin Danielsson, H. Singh Chungkham, C. Wulff, H. Westerlund: Office design’s impact on sick leave rates. Ergonomics 57, 2 (2014) 139–147. [CrossRef] [PubMed] [Google Scholar]
- S.J. Schlittmeier, A. Liebl: The effects of intelligible irrelevant background speech in offices – cognitive disturbance, annoyance, and solutions. Facilities 33, 1/2 (2015) 61–75. [CrossRef] [Google Scholar]
- International Organization for Standardization: Acoustics – Measurement of room acoustic parameters – Part 3: Open plan offices (ISO Standard No. 3382-3). 2012. [Google Scholar]
- M. Yadav, D. Cabrera, J. Love, J. Kim, J. Holmes, H. Caldwell, R. de Dear: Reliability and repeatability of ISO 3382–3 metrics based on repeated acoustic measurements in open-plan offices. Applied Acoustics 150 (2019) 138–146. [CrossRef] [Google Scholar]
- A. Haapakangas, V. Hongisto, M. Eerola, T. Kuusisto: Distraction distance and perceived disturbance by noise – An analysis of 21 open-plan offices. Journal of the Acoustical Society of America 141, 1 (2017) 127–136. [CrossRef] [Google Scholar]
- P. Kelz: Ringversuch zur Raumakustischen Messung von Großraumbüros gemäß DIN EN ISO 3382-3, in 44th German Annual Conference on Acoustics, DAGA München. 2018, pp. 402–404. [Google Scholar]
- L. Lenne, P. Chevret, E. Parizet: Evaluation of Measurement Uncertainties of the D2S in Open-Plan Offices, in 23rd International Congress on Acoustics (ICA), Aachen, 9-13 of September. 2019, pp. 2423–2428. [Google Scholar]
- Joint Committee for Guides in Metrology: Evaluation of measurement data – Guide to the expression of uncertainty in measurement (JCGM Standard No. 100). 2008. [Google Scholar]
- Joint Committee for Guides in Metrology: Evaluation of measurement data Supplement 1 to the “Guide to the expression of uncertainty in measurement” – Propagation of distributions using a Monte Carlo method (JCGM Standard No. 101). 2008. [Google Scholar]
- The Association of German Engineers [Verein Deutscher Ingenieure – VDI]: Sound protection and acoustical design in offices (VDI National Standard No. 2569). 2019. [Google Scholar]
- Association Francaise de Normalisation: Acoustics – Acoustic performance of open-plan offices (Norme francaise No. NF S 31-199). 2016. [Google Scholar]
- V. Hongisto, J. Keränen: Open-plan offices – New Finnish room acoustic regulations, in 11th European Congress and Exposition on Noise Control Engineering (Euronoise), Crete, 27–31 of May. 2018, pp. 1147–1153. [Google Scholar]
- International Organization for Standardization: Acoustics – Acoustic quality of open office spaces (ISO Draft International Standard No. 22955). 2020. [Google Scholar]
- S. Bell: Measurement Good Practice Guide No. 11. A Beginner’s Guide to Uncertainty of Measurement. National Physical Laboratory, 1999. [Google Scholar]
- N.R. Draper, H. Smith: Applied Regression Analysis. Wiley, 1998. [Google Scholar]
- E.T. Jaynes: Information theory and statistical mechanics. Physical Review 106, 4 (1957) 620–630. [NASA ADS] [CrossRef] [MathSciNet] [Google Scholar]
- E.T. Jaynes: Information theory and statistical mechanics II. Physical Review 108, 2 (1957) 171–190. [NASA ADS] [CrossRef] [MathSciNet] [Google Scholar]
- International Electrotechnical Commission: Electroacoustics – Sound level meters – Part 1: Specifications (IEC Standard No. 61672-1). 2002. [Google Scholar]
- International Organization for Standardization: Acoustics – Determination of occupational noise exposure – Engineering method (ISO Standard No. 9612). 2009. [Google Scholar]
- International Organization for Standardization: Acoustics – Determination of sound power levels and sound energy levels of noise sources using sound pressure – Precision methods for reverberation test rooms (ISO Standard No. 3741). 2010. [Google Scholar]
- V. Wittstock: On the uncertainty of single-number quantities for rating airborne sound insulation. Acta Acustica United with Acustica. 93, 3 (2007) 375–386. [Google Scholar]
- International Organization for Standardization: Acoustics – Determination and application of measurement uncertainties in building acoustics – Part 1: Sound insulation (ISO Standard No. 12999-1). 2014. [Google Scholar]
- Qualisyst Ltd: QMSys GUM Professional, Server 4.10, 2018. [Google Scholar]
- J. Selzer, F. Schelle: Practical aspects of measuring acoustics in German open plan offices, in 11th European Congress and Exposition on Noise Control Engineering (Euronoise), Crete, 27–31 of May. 2018, pp. 1919–1924. [Google Scholar]
- International Organization for Standardization: Accuracy (trueness and precision) of measurement methods and results – Part 2: Basic method for the determination of repeatability and reproducibility of a standard measurement method (ISO Standard No. 5725-2). 2019. [Google Scholar]
Cite this article as: Schneider M. Selzer J. Rissler J. Wolff A. & Schelle F, et al. 2021. Uncertainties of ISO 3382-3 sound pressure level quantities. Acta Acustica, 5, 27.
All Figures
Figure 1 Boxplot representation of all 44 measurement path results for D2,S. The individual measurement results are indicated as circles, the mean value is represented by x. |
|
In the text |
Figure 2 Boxplot representation of all 44 measurement path results for Lp,A,S,4 m. The individual measurement results are indicated as circles, the mean value is represented by x. |
|
In the text |
Figure 3 Boxplot of for all 44 measurement paths. The results of the individual calculations are indicated as circles, the mean value is represented by x. Three possible outliers are visible. |
|
In the text |
Figure 4 Boxplot of for all 44 measurement paths. The results for the individual calculations are indicated as circles, the mean value is represented by x. |
|
In the text |
Figure 5 Decrease in combined uncertainty with increasing number of measurement points N along the same measurement paths. Legend shows the number of the office followed by the number of the path. |
|
In the text |
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.