Open Access
Figure 2

Download original image
Increase of the level of the blocked force of an ISO tapping machine according to equation (8) as a function of the falling height of the hammer for a fixed time between hammer impact and hammer lift of t lift = 80 ms and different restitution coefficients.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.